Our experience

A record of success

The leadership team and the consultants at EPCi Consultants has gained substantial direct hands-on experience over numerous projects accross the world including:

  • ARMADA KRAKEN FPSO - US$1.3 Billion Project (North Sea, UK)
  • ARMADA MEDITERRANA LNG FSU+RU (MIDSTREAM & DOWNSTREAM) - (Malta)
  • HUSKEY MADHURA FPSO - (Indonesia)
  • C7 FPSO - (Offshore Mumbai, India)
  • OCTP FPSO-FEED, EPCIO Bid and Contract Negotiation - (Offshore Ghana)
  • ARMADA OLEMBENDO FPSO - US$2.4 Billion Project (Offshore Angola).
  • LION GAS LNG REGAS TERMINAL+LNG STORAGE TANKS - (Port of Rotterdam, Netherlands)
  • MASHAL LNG TERMINAL with FSU+RU - (Port of Karachi, Pakistan) 
  • ROSEBANK PROJECT, FPSO+Subsea Production Field Development - US$10 Billion Future Project - (West of Shetland, UK)
  • SEPIA FPSO - US$2.4 Billion Future Project - (Offshore Brazil)
  • Numerous FLNG Concepts - US$1.2 toUS$2.4B
  • CRD FPSO, FEED & EPC Bid (US$400 Million)
  • FSU+RU Pre-FEED & FEED - (Indonesia)


Our experience allows us to support all forms and sizes of projects. Our understanding of the full Project Life Cycle and Supply Chain gives us the ability to ensure Project Completion, Start Up and reliable Operation throughout project life. We are uniqely qualified to identify and resolve issues quickly to bring a projects back on track and stay on track.

The following project summaries demonstrate our significant achievements and abilities to successfully manage the execution of some of the most challenging projects in the industry.

Get in touch today to see how we can use this experience to help you succeed in your EPCi project.

Kraken - Converted FPSO for UK North Sea


Turn-Around & substantial completion of a Major Conversion FPSO


Kraken FPSO is designed and built for the demanding environment and Regulatory requirements of UK North Sea.


Recovered and achieved substantail completion of a severely delayed major FPSO project.


The recovery of the project required the implementation of major strategies to get the project back on a path to successful completion. As a result, the project:


  • Rescheduled project based on real project status.
  • Reorganized PMT to be delivery focused.
  • Expedited completion & delivery of APL turret mooring system for offshore installation.
  • Implemented & enforced strong Management of Change (MoC) process.
  • Expedited deliveries of all equipment & materials to meet completion targets.
  • Implemented a consistent reporting system across the project.
  • Expedited lifting and integration of all major topsides modules.
  • Implementation of hydro-testing & leak testing.
  • Expedited pre-commissioning & commissioning for the FPSO.
  • Expedited the bidding, selection & award of all critical contracts.
  • Directly managed all teams associated with commercial, contractual, project cash flow, financing, and reporting.

The above is only a summary of key achievements. To find out how your project can benefit from this recent experience please contact us.

Rosebank - Major FPSO & SubseaField Development for UK North Sea


Execution of fast-track Pre-FEED & FEED of a major offshore field development West of Shetland, UK


The Rosebank field was discovered in 2004 & is located 130km north-west of Shetland Islands in water depth of 1,100m. The Rosebank project is considered to be one of the largest undeveloped fields offshore UK. The design production was 100,000 bopd and produce 80 mmscfd of gas.

Gurin was Project Director for all Pre-FEED & FEED phases.

Major achievements of the Rosebank team are summarized below:


  • Successfully executed technical, schedule & cost estimate at all stages of Pre-FEED.
  • Successfully executed this major detailed level FEED in a record-setting 12 months.
  • Successfully managed a 400personnel FEED team alignment with "One Team approach.
  • Ensured the completion & delivery of high-quality FEED Plus deliverables.
  • Managed the completion & delivery of detailed EPC schedule & FID cost estimate in line with Chevron requirements.
  • Assisted Chevron in the award of major contracts for EPC execution phase.
  • Rosebank Project FEED was ranked top three FEED executions in the Chevron portfolio.

Curlew - First UK Safety Case FPSO & Subsea Development in UK


Curlew Field Development - A Record-Setting FPSO Execution


The Curlew Field Development is based on a converted FPSO and subsea production system. It is located in Block 29/7 in the central North Sea, 210km from Aberdeen, Scotland. The Curlew FPSO was designed for offshore UK with production capacities of 45,000 bopd, gas export of 110 mmscfd and storage capacity of 560,000 bbl. It was moored on location via an internal turret supplied by SBM. The EPC scope included not only the FPSO but also the subsea system, flow line and gas export line. The scope include offshore installation, HUC and ongoing Operation & Maintenance for life of field.

The team was responsible for Bidding and Execution of the entire Field Development. Numerous initiatives were implemented on Curlew by the execution team that have since become standard FPSO industry practice. The key achievements on Curlew were and are record setting in the industry :

  • Formulated & implemented the MAS Alliance (Maersk, AMEC, SBM) to bid, win, execute and operate the FPSO. This was the first Alliance of its kind for an FPSO Project.
  • Curlew "win strategy" was developed to win against highly experienced competitor groups.
  • First Safety Case project in UK history and approved by the HSE in record time.
  • First leased FPSO field development awarded by Shell Expro.
  • The first FPSO where topsides fabrication, vessel conversion, integration, installation & commissioning were executed entirely in the UK.
  • Curlew was the first FPSO in the UK to modularize and sub-contract the pipe-rack on an EPC basis.
  • The first project completed in 18 months from Project Award to First Production. A record that has not been beaten.
  • Originally installed in 1997 the FPSO continued to operate successfully until it was de-commissioned in 2019.

Find out more about the original Curlew here.

EPCi CONSULTANTS PTE. LTD

Singapore and Kuala Lumpur

Copyright EPCI CONSULTANTS 2016-19

All rights reserved

Contact Information:

Email: contact@epciconsultants.com